Place of Origin: | Jiangsu, China |
Brand Name: | YONGJIA |
Certification: | CE |
Model Number: | PU Elastomer Casting Machine |
Minimum Order Quantity: | 1 Set/Sets |
---|---|
Price: | Negotiable |
Packaging Details: | sea worthy wooden box for PU Elastomer Polyurethane Injection Machine For Forklift Load Wheel Making |
Delivery Time: | 45-60 days |
Payment Terms: | L/C, D/A, D/P, T/T, Western Union, |
Supply Ability: | 100 Set/Sets per Month Polyurethane elastomer casting tire casting pu wheels |
Processing Type: | Foaming Machine, Foaming Machine | Condition: | New |
---|---|---|---|
Product Type: | Foam Net | Machine Type: | Foaming Machine |
Voltage: | 380V | Dimension(L*W*H): | 2300*2000*2300 Mm |
Power (kW): | 25~31kW | Weight (KG): | 2000 KG |
Warranty: | 1 YEAR | After-sales Service Provided: | Video Technical Support, Field Installation, Commissioning And Training, Field Maintenance And Repair Service, Online Support |
Key Selling Points: | Automation | After Warranty Service: | Video Technical Support, Online Support, Spare Parts, Field Maintenance And Repair Service |
Local Service Location: | Turkey, Pakistan, India | Showroom Location: | Turkey, Pakistan, India |
Applicable Industries: | Manufacturing Plant, Construction Works | Key Words: | PU Balance Wheel For Forklift Truck |
Mix Head: | Mix Evenly, No Bubble | Injection Pressure: | 0.01-0.1Mpa |
Injection Time: | 0.5~99.99S (correct To 0.01S) | Temperature Control: | ±2℃ |
Repeated Injection Accuracy: | ±1% | Color: | Deep Blue/cream Color/red |
Ratio Between A And B: | 1 : 1 | Raw Material: | Polyol And Isocyanate |
Port: | Ningbo | ||
High Light: | 0.6Mpa PU casting machine,380V Polyurethane Casting Equipment,0.6Mpa Polyurethane Casting Equipment |
No. | Item | Technical Parameter |
1 | Injection Pressure | 0.1-0.6Mpa |
2 | Injection flow rate | 2-5kg/min |
3 | Mixing ratio range | 100:6-18(adjustable) |
4 | Injection time | 0.5~99.99S (correct to 0.01S) |
5 | Temperature control error | ±2℃ |
6 | Repeated injection precision | ±1% |
7 | Mixing head |
Around 5000rpm (4600~6200rpm,adjustable), forced dynamic mixing |
8 | Tank volume | 220L/30L |
A maximum working temperature | 70~110℃ | |
B maximum working temperature | 110~130℃ | |
9 | Cleaning tank |
20L 304# stainless steel |
10 | Metering pump | JR50/JR50/JR9 |
A1 A2 Metering pump displacement | 50CC/r | |
B Metering pump displacement | 6CC/r | |
A1-A2-B-C1-C2 PUMPS MAXIMUM SPEED | 150RPM | |
A1 A2 agitator speed | 23RPM | |
11 | Compressed air requirement |
Dry, oil free P:0.6-0.8MPa Q:600L/min(Customer-owned) |
12 | Vacuum requirement |
P:6X10-2Pa(6 BAR) Speed of exhaust:15L/S |
13 | Temperature control system | Heating: 18~24KW |
14 | Input power | Three-phrase five-wire,380V 50HZ |
15 | Heating power |
TANK A1/A2: 4.6KW TANK B: 7.2KW |
16 | Total power | 34KW |
17 | Working Temperature | Room temperature to 200℃ |
18 | Swing arm | Fixed arm, 1 meter |
19 | Volume | About 2300*2000*2300(mm) |
20 | Color (selectable) | Deep blue |
21 | Weight | 2000Kg |
High temperature resistant low speed high precision metering pump,accurate measurement,random error within±0.5%.
Material output adjusted by frequency converter with frequency conversion motor,high pressure and precision,simple and rapid rapid ratio control.
High performance mixing device,adjustable pressure,accurate material output synchronization and even mix;New type mechanical seal structure avoids reflux problem.
High-efficiency vacuum device with special mixing head ensures product no bubbles.
Adopting electromagnetic heating method to heat transfer oil,efficient and energy saving;Multi-point temp.control system ensures stable temperature,random error<±2°C.
Adopting PLC and touch screen man-machine interface to control pouring,automatic cleaning flush and air purge.stable
performance.high operability,which can automatically distinguish,diagnose and alarm abnormal situations as well as display abnormal factors.
Widely used in the production of CUP type PU elastomer items which adopt MOCA or BDO as chain extender,such as CPU wheel,castor,roller,sieve plate,impeller,seal ring,shock absorber,dumbell and so on.
Packaging
|
|
Size
|
2300*2000*2300( mm)
|
Weight
|
2.2 T
|
Packaging Details
|
The normal package is wooden box(Size: 2600*2300*2600). If export to european countries,the wooden box will be fumigated.If container is too tigher,we will use pe film for packing or pack it according to customers special request.
|
Yongjia Polyurethane Co., Ltd. is a professional machinery manufacturer in PU industry combined with design, development, production. Founded in 2013, the construction area of over 10,000 square meters, is the China forefront polyurethane technology company. At present our company's products range covers:high pressure pouring machine, low pressure foaming machine, PU spraying foam machine, PU elastomer casting machine, also we customize to make production line according to clients requirement,like in flexible foam system we make the lines: PU shoe /sole/insole production line(Egypt),anti-fatigue mat production line(India),memory pillow production line(Iran),Albania,elastic ball production line(Mexico),car seat and cushion production line(Morocco),PU slow rebound ear plugs line(India);rigid foam system we make the line:PU decorative molding crown cornice line(Saudi Arab), float trowel making line(Saudi Arab, Pakistan), cold storage panel production line(Uzbekistan),sandwich panel production line(Iraq).Elastomer line:forklift wheel casting line(lran);coal sieve screen select line(Russia).
1. Are you factory or trading company?
We are professional factory in PU industry with more than 10 years experience, covering high pressure pouring machine,low pressure foaming machine, pu spraying foam machine,pu elastomer casting machine and production line.
2. Where is your factory ?
Our Factory is located in Wuxi city, Jiangsu Province.
3. How can I get your factory?
By air: You can take a plan to WUXI airport from China, if you fly from Korea ,Japan, USA, Singapore, Taiwan, Thailand you will can directly fly to us.
By Train: You can stop at WUXI station, Not WUXI EAST station.
4. Do you provide pick-up service?
Yes, of course. If you are in Wuxi airport or station, we can arrange a special car to pick you up directly to our factory.
5. If I need to develop a special PU raw material formula solution based on my product, can you provide it?
Yes, we can. We have technical team of chemical engineers and process engineers, all of whom have more than 20 years of experience in PU industry. We can independently develop raw material soluation like polyurethane rigid foam, polyurethane flexible foam, polyurethane integral skin foam and polyurea to meet customer' s requirements.
6. How to solve the polyurethane foaming machine failure?
For pu spraying machine: If there are quality problems with accessories during the one-year warranty period, we can provide replacement parts for free. If there are operations or other problems, you can send photos or videos to us, we will consult our engineers to help you solve the problem.
For high/low pressure foam dispensing machine, elastomer casting machine and other production line: our machine all have remote maintenance and diagnosis function. You can also send us pictures or videos, our engineers can help to solve the problems via pictures and videos.
7. What if I don't install it after I get the polyurethane pouring machine? Do you offer installation services?
Yes, we supply video technical support. If your company has engineer, you can come to our factory, we will provide field installation, commissioning and training. Of course, our engineers are available to service machinery overseas.
Contact Person: admin
Tel: +8613656166310